"In the DRC, to set up a 10,000 tonne ore plant that will produce electric batteries requires an investment of $39 million. The same factory when installed in the United States, requires $117 million to make it operational. The same plant when installed in China requires $112 million."- Minister
- Category
- Democratic Republic of Congo
- Tags
- Africaneconomy, DemocraticRepublicofCongo, Mining
Be the first to comment



